CUSTOMER CASENEOM Workers Villages

BIM Collaboration Drives Efficiency and Sustainability at NEOM Workers Villages

Key project challenges:

  • Adopt BIM from concept to coordinate information flow between designers, engineers and external contractors.
  • Work with partners who are experienced in BIM and have the required expertise in hardware specification.
  • Enable workflows which promote creativity and a methodical, technically astute approach to building design.
  • Ensure open, transparent communication for the duration of the project, which encourages collaboration.

Solutions:

Qantara Development champions the BIM process for boosting productivity and expediting delivery, showcasing industry-leading technical efficiency in design and construction. At NEOM Workers Villages, their collaboration with ASSA ABLOY leveraged Openings Studio software.

ASSA ABLOY Opening Solutions provides detailed door specifications that integrate seamlessly with Revit®, streamlining information sharing and hardware updates within the BIM environment. By eliminating manual data handling, Openings Studio ensured efficient updates without information loss, keeping hardware and certification data, including fire and egress ratings, readily accessible.

BIM partner: Qantara Development

Type: Developer

Company profile: Qantara Development Founded in 2020 in the Kingdom of Saudi Arabia, our company provides comprehensive, lifecycle advisory, consulting, and development services, coupled with implementation, operations, and asset management

Project: NEOM Workers Villages, a mixed-use development for a staff accommodation

Specification size: 36,500 Doors

Location: Saudi Arabia

Segment: Residential

Software: Autodesk® Revit®

ASSA ABLOY solutions supplied: Incedo Electronic Access Control, Aperio Wireless Locks, ABLOY Electromechanical Locks, effeff Electric Strikes, Mechanical Hardware